UAE-Georgia

Mobilization of oilfield Equipment’s in range of 18 meters long and weight of 38 Tones from Jebel Ali to Poti Georgia.

Challenge

The major challenge in this case was Length of 18 Meters , Gross weight of 38 Tons where Flat rack option is not a possibility, and due to small parcel a part charter was not possible, not to mention compliance issue of not crossing certain countries.

Solution

Heavy Load Owned extended trailer (Which can be extended up to 21 Meters) was used to load the unit from Jebel Ali and deliver by the same truck to Poti Georgia in 12 Days.